Home >Who is Eoluz  > References > B2B Projects > 250 kWp
 
 
 
Last update:
February 08. 2019 16:07:25
 
 
 
 

B2B Projects > 250 kWp

In this column, you will find references from our sites with an installed AC power greater than 200 kW. These installations are connected to a mid voltage grid and require a previous study of the mains by the mains supplier. A separate injection counter is always required here.  

  

Sibelga Solarclick (raamcontract) - ca. 1 MWp
Installation 2018: Ecole Van Oost (Schaarbeek), Résidence van Aa (Elsene), Ecole Epep (Elsene), Home Puccini (Anderlecht), Ecole La Source (Evere), Zwembad Triton (Evere), Ecole du Homborch (Ukkel),  Administration Centrale (Ukkel) 
     
   
     

  

Wattson/Armonea residential care centres - ca. 800 kWp

Installation 2018: Salve (Brasschaat), De Notelaar (Olen), Den Brem (Rijkevorsel), Heiberg (Beerse), Laarsveld (Geel), Vogelzang (Herentals)

   

  

Cordeel administrative building - Temse

Novembre 2018
259,2 kWp
Trina 270 Wp

   

 

Slaughterhouse Anderlecht - Brussel

June 2018
1.167,075 kWp
LG 325 Wp

 

Wienerberger - Aalbeke

October 2017
910,27 kWp
REC 270PE + Korasun glass-glass 182 kWp

 

AZ Zeno - Knokke-Heist

May 2017
334,95 kWp
REC 290TP

 

Centre Sportif (ADEPS) - Brussel

December 2016
966 kWp
REC 280 TP

 

Montea logistics centre - Vorst

March 2016
548,55 kWp
CSUN 265 Wp

   

Hospital "AZ Groeninge" - Kortrijk

January 2015
931,5 kWp
Suntech 270 Wp monocrystalline

klik hier klik hier klik hier

   

School "Lycée de Redange" - Redange-sur-Attert (Groothertogdom Luxemburg)

August 2014
1.216,35 kWp
Yingli Panda 265 Wp

 

Public Prison "Poort van  Beveren"

December 2013
301,44 kWp
Sunways 240 Wp 

 

Public prison "Future Prisons Leuze" - Leuze-en-Hainaut

November 2013
405,23 kWp
Yingli 245 Wp 

 

Sheltered workshop "Travail & Vie" - Brussel

July 2013
528,465 kWp 
Yingli 245 Wp 

 

Assembly factory "Audi" - Vorst (Brussels Gewest)

May 2013
3.547 kWp (3,55 MWp)
REC 245 Wp – 9.288 modules
CSun 250 Wp – 5.088 modules

 

Shopping Olen fase 2 - Olen

July 2012
539,80 kWp
Suntech STP200S-24/Ad - 2.699 modules

 

Business hall "Professionails" - Brasschaat

June 2012
258 kWp
REC 235PE - 1.098 modules

 

 

 
 
 
 
 
© Eoluz NV | Expert in photovoltaic installations
English Version Version Française Nederlandse Versie